No commissioning report, no final inspection.

Under C408, a building isn't ready for final inspection until the owner has acknowledged the preliminary commissioning report. We write the Cx plan, test the systems with your crews and deliver both reports on your schedule, at a fixed price.

Does your project need it?

Three questions about the systems in your scope.

Total cooling capacity of 480,000 Btu/h (40 tons) or more?
Combined space and water heating of 600,000 Btu/h or more?
Occupancy, daylight or time-switch lighting controls?
Answer all three
We will tell you which C408 commissioning your project needs.

Based on the C408.2 exception. Systems serving individual dwelling units are exempt. Confirm the edition your jurisdiction enforces.

What C408 asks for, and when

  1. During design

    Commissioning plan

    Systems in scope, tests to be performed, schedule and responsibilities. We also write the Cx section of your specifications.

  2. During construction

    TAB review and functional tests

    Your certified TAB agency balances the systems. We review the TAB report and spot-check it in the field, then test every mode in the sequence of operations: interlocks, alarms, power loss and restore, economizers, calibrated controls. Lighting controls tested by sample.

  3. Before final inspection

    Preliminary Cx report

    Compliance checklist, deficiencies, deferred seasonal tests and results with acceptance criteria. The owner's letter acknowledging it goes to the building official.

  4. Within 90 days of CO

    Final Cx report

    All results and corrections, the final balancing report, O&M manuals and record documents handed to the owner.

One scope, two kinds of client

MEP engineers and architects

Put a named CxA in your specs and stop carrying commissioning risk in your fee.

  • Cx plan and specification section
  • Design review against the sequence of operations
  • Reports issued under the design team's schedule

General and MEP contractors

Know exactly what will be tested, before the test day, so final inspection isn't where you find out.

  • Test scripts shared in advance on your crews' phones
  • Issues assigned by company with a 7 and 14 day clock
  • Same-day site reports, no monthly surprises

Where we work, and what each code enforces

JurisdictionEnergy codeWhat to watch
New York City2025 NYC Energy Conservation CodeCommissioning ties into DOB progress inspections and sign-off
New York State2025 Energy Code of NYSOwner's letter on the preliminary report before final inspection
New Jersey2024 IECC, adopted August 2026Check whether your permit falls under the grace period for the prior code
Pennsylvania2021 I-Codes in the UCC since January 1, 2026Philadelphia publishes its own Cx compliance checklist
Washington, DCDC Energy Conservation CodeOften paired with LEED or Green Building Act requirements

Commissioning is performed by an ASHRAE BCxP. Where a jurisdiction requires a registered design professional to certify the report, our partner PE signs.

Going for LEED too? Do it once.

LEED Fundamental Commissioning covers everything C408 asks for and more. One CxA, one test record and one set of reports satisfies both the code official and the LEED reviewer.

Quote code and LEED together
Commissioning acceptance report with test results and witnesses per step
Reports are generated from the test record and frozen when issued, so what the code official sees is exactly what was tested.

C408 questions

Do you perform testing, adjusting and balancing (TAB)?

No. TAB is performed by an independent AABC or NEBB certified agency, usually under the mechanical contractor. We review the TAB report and verify a sample of readings in the field before functional testing. Keeping the two roles separate is what makes our verification independent.

Who is allowed to commission under C408?

The code calls for a registered design professional or an approved agency. Our commissioning is performed by an ASHRAE BCxP; where your jurisdiction requires a licensed engineer to certify the report, our partner PE signs it.

Can C408 and LEED commissioning be the same work?

Yes. LEED Fundamental Commissioning includes the C408 scope and adds owner's requirements, design review and a systems manual. Doing both under one CxA avoids paying twice for the same tests.

What if some tests can't be done until summer or winter?

The code allows seasonal tests to be deferred. They are listed in the preliminary report, scheduled, and closed out in the final report.

Our final inspection is in a few weeks and nobody has started.

That is what Cx Rescue is for: a 3-day gap assessment, then a fixed price to get the preliminary report done in time.

Do small projects need anything?

Projects under the mechanical thresholds may be exempt from mechanical commissioning, but lighting controls still need functional testing. Use the checker above, then confirm with your building official.

Send the mechanical schedule. Get a fixed price.

Tell us the project and the equipment in scope. We reply within two business days with scope, schedule and a fixed fee.

Reply within two business days.

Guidance, not a code interpretation; confirm with your building official.