Do we have to replace our current CxA?
No. Most Cx Rescue work runs alongside the CxA already on the project. They keep the sign-off; we add people on site, work to their Cx plan and hand them witnessed evidence for every item we close.
What if the CxA role is open?
Then we take the commissioning scope. We load the work already on record, verify it on site and continue from there. Nothing documented is thrown away, and nothing undocumented is assumed.
Who do you work for, the GC or the owner?
Either can hire us, but we report findings to the owner as well. An independent CxA is what LEED and most owner contracts require, and it is what makes the turnover package hold up.
Which requirements do you close out to?
LEED v4, v4.1 and v5 Fundamental and Enhanced Cx, IECC C408, the NYC Energy Code, ASHRAE Guideline 0 and Standard 202, or the owner's own Cx specification.
How fast can you start?
Anywhere in the US. In New York, New Jersey, Pennsylvania, DC, Connecticut, Rhode Island, Massachusetts, Maryland and Virginia we are on site within 48 hours of the first call. Everywhere else you get an action plan within one business day and a confirmed site date on the call. Tell us the turnover date on the call and we will tell you honestly whether it can be met.
What does it cost?
The gap assessment ends with a fixed price to close every open item, so you know the full cost before you commit.
What does "accepted" mean for payment?
The open items in the gap report are closed or formally deferred by the owner, and the turnover package is accepted by the owner or their representative. That is when the closeout fee is due.