MAS Dynamics, Holistic Engineering and Environmental Consultancy

LEED Fundamental and Enhanced Commissioning, v4, v4.1 and v5

LEED commissioning a reviewer can check device by device.

From the OPR to the systems manual, on one record. We have also worked on 20 LEED Platinum projects as LEED consultants and energy modelers, so we know exactly which commissioning evidence each credit needs and how reviewers read it.

The commissioning points on the table

BD+C new construction. We price each path separately so you can choose the points that make sense for your project.

ScopeLEED v4 and v4.1LEED v5
Fundamental CommissioningPrerequisitePrerequisite, now with early design tasks and envelope Cx
Enhanced MEP commissioning3 points2 points, to ASHRAE 202-2024
Enhanced plus monitoring-based Cx4 pointsMBCx 1 to 2 points, 3 years of monitoring
Building enclosure commissioning2 points1 point for enhanced enclosure testing

Enhanced Commissioning totals up to 6 points in v4 BD+C and up to 4 points in v5. Points vary by rating system; we confirm them against your scorecard.

What you receive, phase by phase

  1. Predesign and schematic design

    Requirements set

    Owner's project requirements, basis of design review, commissioning plan, first design review.

  2. Construction documents

    Cx built into the specs

    Commissioning specification, design review comments closed out, submittal review for systems in scope.

  3. Construction

    Verified on site

    Construction checklists, witnessed functional tests, issues log with every item clocked and closed.

  4. Occupancy

    Handed over

    Commissioning report, systems manual, training verified, and the post-occupancy review or MBCx that your path calls for.

Envelope commissioning, independent by design

We lead enclosure Cx to ASTM E2947: design review, submittal review and field observation. Air leakage, water penetration and infrared tests are run by a certified testing agency and witnessed by us, the same way your TAB agency balances and we verify.

Three years of MBCx on the same record

The record that commissioned the building keeps running after occupancy: quarterly anomaly summaries, annual reports and system reviews, with every finding tracked to closure.

For LEED consultants: you run the certification, we deliver the Cx credits

Your client needs an independent CxA. We join your team, work to your schedule and hand you commissioning documentation ready to upload, written by people who have prepared LEED submittals themselves.

Talk about a project

Kohler Woodlake Market, Kohler, Wisconsin

LEED ID+C Retail Gold, with commissioning, LEED and energy modeling from one team

When the CxA also understands the credits and the energy model, nothing falls between consultants.

LEED Platinum projects
20
certified projects across LEED, EDGE and Fitwel
98
LEED commissioning acceptance report with test results and witnesses
Acceptance reports are generated from the record and frozen when issued, so the LEED reviewer sees exactly what was tested.

LEED Cx questions

When do you need to bring us in?

Under LEED v5, the CxA must be engaged by schematic design at the latest. Under v4 and v4.1 the Enhanced credit also expects early involvement. The earlier we start, the more design issues are fixed on paper instead of on site.

Are you independent enough for Enhanced Commissioning?

Yes. We are not part of the design team or the contractor, and we do not perform TAB or enclosure testing ourselves. We review and witness the work of those who do.

Do you also do LEED certification consulting?

Yes. MAS Dynamics has delivered LEED consulting on about 100 projects worldwide, and worked on 20 Platinum projects as LEED consultant or energy modeler. On your project we can be the CxA only, or both, depending on what your team needs.

We are already in construction and have no CxA. Is it too late?

For v4 and v4.1 projects it is often still recoverable; for v5 the early design tasks are required. Talk to us first, and if turnover is close, see Cx Rescue.

What is the sample device passport?

A real-format example of the record each device in scope receives at turnover: location, checklist, functional test steps, witnesses, decision and issue history, generated from our platform.

Get a LEED Cx proposal, priced by credit

We reply within two business days with scope, schedule and a fixed fee for each path. Ask for the sample device passport and we send it with the proposal.

LEED is a trademark of the U.S. Green Building Council.