LEED Fundamental and Enhanced Commissioning, v4, v4.1 and v5
LEED commissioning a reviewer can check device by device.
From the OPR to the systems manual, on one record. We have also worked on 20 LEED Platinum projects as LEED consultants and energy modelers, so we know exactly which commissioning evidence each credit needs and how reviewers read it.
BD+C new construction. We price each path separately so you can choose the points that make sense for your project.
Scope
LEED v4 and v4.1
LEED v5
Fundamental Commissioning
Prerequisite
Prerequisite, now with early design tasks and envelope Cx
Enhanced MEP commissioning
3 points
2 points, to ASHRAE 202-2024
Enhanced plus monitoring-based Cx
4 points
MBCx 1 to 2 points, 3 years of monitoring
Building enclosure commissioning
2 points
1 point for enhanced enclosure testing
Enhanced Commissioning totals up to 6 points in v4 BD+C and up to 4 points in v5. Points vary by rating system; we confirm them against your scorecard.
What you receive, phase by phase
Predesign and schematic design
Requirements set
Owner's project requirements, basis of design review, commissioning plan, first design review.
Construction documents
Cx built into the specs
Commissioning specification, design review comments closed out, submittal review for systems in scope.
Construction
Verified on site
Construction checklists, witnessed functional tests, issues log with every item clocked and closed.
Occupancy
Handed over
Commissioning report, systems manual, training verified, and the post-occupancy review or MBCx that your path calls for.
Envelope commissioning, independent by design
We lead enclosure Cx to ASTM E2947: design review, submittal review and field observation. Air leakage, water penetration and infrared tests are run by a certified testing agency and witnessed by us, the same way your TAB agency balances and we verify.
Three years of MBCx on the same record
The record that commissioned the building keeps running after occupancy: quarterly anomaly summaries, annual reports and system reviews, with every finding tracked to closure.
For LEED consultants: you run the certification, we deliver the Cx credits
Your client needs an independent CxA. We join your team, work to your schedule and hand you commissioning documentation ready to upload, written by people who have prepared LEED submittals themselves.
LEED ID+C Retail Gold, with commissioning, LEED and energy modeling from one team
When the CxA also understands the credits and the energy model, nothing falls between consultants.
LEED Platinum projects
20
certified projects across LEED, EDGE and Fitwel
98
Acceptance reports are generated from the record and frozen when issued, so the LEED reviewer sees exactly what was tested.
LEED Cx questions
When do you need to bring us in?
Under LEED v5, the CxA must be engaged by schematic design at the latest. Under v4 and v4.1 the Enhanced credit also expects early involvement. The earlier we start, the more design issues are fixed on paper instead of on site.
Are you independent enough for Enhanced Commissioning?
Yes. We are not part of the design team or the contractor, and we do not perform TAB or enclosure testing ourselves. We review and witness the work of those who do.
Do you also do LEED certification consulting?
Yes. MAS Dynamics has delivered LEED consulting on about 100 projects worldwide, and worked on 20 Platinum projects as LEED consultant or energy modeler. On your project we can be the CxA only, or both, depending on what your team needs.
We are already in construction and have no CxA. Is it too late?
For v4 and v4.1 projects it is often still recoverable; for v5 the early design tasks are required. Talk to us first, and if turnover is close, see Cx Rescue.
What is the sample device passport?
A real-format example of the record each device in scope receives at turnover: location, checklist, functional test steps, witnesses, decision and issue history, generated from our platform.
Get a LEED Cx proposal, priced by credit
We reply within two business days with scope, schedule and a fixed fee for each path. Ask for the sample device passport and we send it with the proposal.