Non-residential, 50,000 gsf and larger
Interim standard December 31, 2028, final standard December 31, 2033.
Montgomery County, Maryland Building Energy Performance Standards
Commercial and multifamily buildings of 25,000 gross square feet and larger must bring site energy use intensity down to a standard for their property type. Non-residential buildings of 50,000 gsf and larger meet the interim standard at the end of 2028 and the final standard at the end of 2033.
Around 1,850 buildings in the County, grouped by size and type.
Interim standard December 31, 2028, final standard December 31, 2033.
Later groups, with interim deadlines from 2030. We confirm your group on the first call.
Site energy use intensity. The interim standard sits halfway between the building's baseline and its final standard.
Two years is enough time to close most gaps, if the measures are in place early.
Baseline, interim standard and the distance between them, from your benchmarking history.
Controls, schedules, setpoints and sequences tuned and verified device by device. Usually the fastest and least costly way to cut energy use and emissions.
CommissioningThe audit and retrofit plan a Building Performance Improvement Plan requires, with a qualified auditor.
Energy modeling and auditsWhere a standard is not economically feasible, a plan of cost-effective measures the County can approve.
Your June 1 report prepared from clean data, so the EUI the County sees is the real one.
Measures and capital timing for the final standard, so the interim target is a step, not a stop.
Measures in place early count for the full year.
Week 1
Baseline, interim target and the size of the gap.
2027
Retro-commissioning and quick measures in place, savings verified.
If needed
Audit, assessment and improvement plan prepared for the County.
June 1 each year
Annual report filed from verified data.
December 31, 2028
Building at or below the interim site EUI.
On site within 48 hours in Maryland
We are on site in Montgomery County within 48 hours of the first call, and the same engineers cover DC BEPS.
Site energy use intensity, energy use per square foot. Compliance under the performance pathway uses normalized net site EUI.
Halfway between the building's baseline and the final standard for its property type. The baseline comes from the building's benchmarking history.
If meeting it is not economically feasible or is beyond your control, you can apply for a Building Performance Improvement Plan, based on an energy audit and a plan of cost-effective measures.
Measures that pay back within the life of the equipment, or within 10 years for specially designated buildings such as affordable housing.
Maryland has its own statewide building energy performance standards. We check which requirements apply to your building on the first call.
Tell us the building. We reply within one business day and can be on site in Montgomery County within 48 hours.
Prefer to talk? +1 (646) 296-8091 or [email protected]
From Montgomery County Department of Environmental Protection BEPS guidance and bulletins as of November 2026. Confirm your building's group and deadlines with DEP.