MAS Dynamics, Holistic Engineering and Environmental Consultancy

Philadelphia Building Energy Performance Program

Philadelphia BEPP: 100,000 to 200,000 sf buildings are due September 30, 2027.

Every five years, non-residential buildings of 50,000 square feet and larger either complete a tune-up, certify as high performance or follow an alternative compliance plan. A missed deadline means a $2,000 fine, and the report is still required.

Book a 15-minute BEPP check Key dates

Who is covered and when

Non-residential buildings of 50,000 square feet and larger, on a five-year cycle set by size.

Over 200,000 sf

2026 cycle. Tune-up reports were due September 30, 2026. Missed it? The report is still required, and we can start now.

100,000 to 200,000 sf

2027 cycle. Tune-up report due September 30, 2027.

50,000 to 100,000 sf

70,000 to 100,000 sf by October 2, 2028; 50,000 to 70,000 sf by October 1, 2029.

How we help

A tune-up that actually changes how the building runs, and a report the City accepts.

BEPP check

Which cycle the building is in, which path fits and whether high performance certification is within reach.

Tune-up

Energy systems and controls reviewed and brought back to a good state of performance, fixes verified device by device.

Commissioning

Certified tune-up specialist

The City requires a certified specialist, a PE or CEM with seven years of experience. We deliver the tune-up with a City-certified partner specialist signing the report.

High performance path

The data and documentation to certify as a high performance building instead of a tune-up, where the building qualifies.

Alternative compliance plan

Engineering support for an alternative compliance plan, from January of the cycle year.

Beyond the tune-up

Measures and retro-commissioning that keep the savings and prepare the building for the next cycle.

Energy modeling

How a BEPP tune-up runs

Plenty of time before September 30, 2027 if you start early.

  1. Week 1

    Check

    Cycle, path and scope of the tune-up.

  2. By April 5

    Path chosen

    High performance report, exemption or extension filed, if one applies.

  3. Field work

    Tune-up

    Systems and controls reviewed and corrected with your team.

  4. Verification

    Fixes proven

    Every correction checked and recorded device by device.

  5. By September 30

    Report

    Tune-up report submitted with the specialist's certification.

On site within 48 hours in Pennsylvania

Philadelphia with the team that does code commissioning too

We are on site in Philadelphia within 48 hours of the first call, for BEPP tune-ups and the commissioning the energy code requires.

Book a BEPP checkCode-required Cx (C408)

BEPP questions

Our building is over 200,000 sf and we missed September 30, 2026. Now what?

Missing a deadline carries a $2,000 fine, and the tune-up report is still required. The sooner it is submitted, the better; we can start right away.

Who can do the tune-up?

The report must come from a tune-up specialist certified by the City: a Professional Engineer or Certified Energy Manager with seven years of related education and experience. Our tune-ups are signed by a City-certified partner specialist.

Is a tune-up the same as retro-commissioning?

A tune-up is a shorter review of energy systems and controls with minor adjustments. We run it with commissioning discipline, so every fix is verified and recorded.

Can we skip the tune-up?

Buildings that certify as high performance, or follow an approved alternative compliance plan, do not need a tune-up. We check which applies before you choose.

How often does this come back?

Every five years, on the cycle set by your building size.

Book a 15-minute BEPP check

Tell us the building and its size. We reply within one business day and can be on site in Philadelphia within 48 hours.

Prefer to talk? +1 (646) 296-8091 or [email protected]

From the City of Philadelphia Office of Sustainability BEPP pages as of November 2026. Confirm your building's requirements in the BEPP knowledgebase or with the City.